Installation Guide
General steps for installing a putting green cup with an LED golf cup light. These are generic guidelines — the instructions supplied with your fixture always take priority.
Safety first. Follow the fixture manufacturer's instructions. Call 811 before you dig. Low-voltage wiring connections should be made by a qualified person where local code requires it. Plug transformers only into GFCI-protected outdoor outlets.
Before you begin
- Unpack the kit and confirm every component is present: cup, flagstick, flag, LED fixture, wiring, drainage and hardware.
- Choose the cup location — avoid the lowest point of the green where water collects.
- Plan the wiring route from the cup to your low-voltage power source.
General installation steps
- Mark the cup location and outline.
- Cut the turf (synthetic) or sod (natural) cleanly along the outline.
- Excavate to the depth the cup requires, plus room for drainage material beneath.
- Add drainage material and set the cup level with its rim flush with the finished surface.
- Route wiring to the fixture position as described in the fixture instructions, leaving a service loop.
- Backfill in layers and compact firmly around the cup.
- Restore the turf edge neatly around the cup lip.
- Install the LED fixture, then the flagstick and flag.
- Connect to power and test before final infill or cleanup.
Specifications
We'll publish verified specifications — including power requirements and dimensions — before launch.
More detail: Installing a golf cup in artificial turf · Low-voltage lighting basics
Light your backyard green.
Cup, LED fixture, wiring, drainage hardware, flagstick and flag in one kit. Packages of 1, 3, 4 or 6.
See the LED Golf Cup Light Kit