Skip to content
Ships within 3 business days · Square or Stripe checkout
Golf Cup Lights

Installation Guide

General steps for installing a putting green cup with an LED golf cup light. These are generic guidelines — the instructions supplied with your fixture always take priority.
Safety first. Follow the fixture manufacturer's instructions. Call 811 before you dig. Low-voltage wiring connections should be made by a qualified person where local code requires it. Plug transformers only into GFCI-protected outdoor outlets.

Before you begin

  • Unpack the kit and confirm every component is present: cup, flagstick, flag, LED fixture, wiring, drainage and hardware.
  • Choose the cup location — avoid the lowest point of the green where water collects.
  • Plan the wiring route from the cup to your low-voltage power source.

General installation steps

  1. Mark the cup location and outline.
  2. Cut the turf (synthetic) or sod (natural) cleanly along the outline.
  3. Excavate to the depth the cup requires, plus room for drainage material beneath.
  4. Add drainage material and set the cup level with its rim flush with the finished surface.
  5. Route wiring to the fixture position as described in the fixture instructions, leaving a service loop.
  6. Backfill in layers and compact firmly around the cup.
  7. Restore the turf edge neatly around the cup lip.
  8. Install the LED fixture, then the flagstick and flag.
  9. Connect to power and test before final infill or cleanup.

Specifications

We'll publish verified specifications — including power requirements and dimensions — before launch.

More detail: Installing a golf cup in artificial turf · Low-voltage lighting basics

Light your backyard green.

Cup, LED fixture, wiring, drainage hardware, flagstick and flag in one kit. Packages of 1, 3, 4 or 6.

See the LED Golf Cup Light Kit